
Add to Cart
Liner Type 6 Lane Tea Capsule Cup Filling Sealing Packaging Machine
Descrption :
This machine is automatic high-speed sealing machine. From drop cups, filling, put the film, print dates, twice sealing to out are all automatic operation. The electrical and pneumatic components are all using famous brands ( can be also customized by customers’ requirements), with stable quality, long life.
Applications:
It is mainly used in the products packing like: Tea powder or grains tea coffee powder, milk powder, rice, wheat powder and so on.
Technical Paremeter
Item | Espresso coffee capsule filling sealing machine/Coffee Capsule Packing Production Line/Espresso Coffee Capsule Packing Product | ||||
Model | NC-4/KC-4 | NC-6/KC-6 | NC-8/KC-8 | NC-10/KC-10 | NC-12/KC-12 |
Capacity | 3000-4000cups/h | 4000-5000cups/h | 5000-6000cups/h | 6000-7000cups/h | 7000-8000cups/h |
Filling Capacity | 5-30ml | 5-30ml | 5-30ml | 5-30ml | 5-30ml |
Total Power | 4KW | 4.5KW | 5KW | 5.5KW | 6KW |
Air Consumption | 0.65 cubic meters/min | 0.68 cubic meters/min | 0.70 cubic meters/min | 0.73 cubic meters/min | 0.78 cubic meters/min |
Voltage | 220V/50Hz | 220V/50Hz | 220V/50Hz | 220V/50Hz | 220V/50Hz |
Temperature Range | 0-300℃ | 0-300℃ | 0-300℃ | 0-300℃ | 0-300℃ |
Machine Weight | 800KG | 900KG | 950KG | 1000KG | 1100KG |
Size (mm) | 3500*800*1750 | 3500*1100*1750 | 3900*800*1750 | 3900*1100*1750 | 3900*1300*1750 |
Linear Type 6 Lanes Tea Capsule Filling & Sealing Machine
Features:
Please don't be hesitate! Contact us and get more Coffee Pod Packaging Machine details!
Q1:Are you factory or trading company?
A: We are factory and manufacture.
Q2: Where is your factory located? How can I visit your factory?
A: We are located in Shanghai, you can fly to Shanghai Hongqiao airport or Pudong airport. Wecan pick you up from the airport or your hotel.
Welcome to visit us!
Q3:How to place my order?
A: Just contact us via TraderManager, E-mail, Skype or telephone to confirm the product, make the deposit then we will start to manufacture.
Q4 : What is the payment term?
A: 30% T/T deposit and 70% T/T balance payment before shipping.
Q5:How long is the delivery time?
A: About 35- 40 working days.